Updated on October 9th by H.Tamura


** Announcement **
  • It is announced that the present beam time will end at November 8th.
  • Important decision was made by Tom Kirk. We may run for 7 weeks with a pripoiry, that is, with the best proton energy and spill length as we like (probablly 20-22 GeV and around 1.5 sec spill). But E930 should be completed in 7 these weeks.


    ** Important issues **
  • The repaired ORTEC detector has arrived. it will be installed soon.
  • The broken Eurisys detector was successfully repaired in Japan. It will be shipped on Oct. 4th.