BGO counters are installed on the Hyperball frame.


Ge detectors are being mounted.


Cabling and noise reduction of chambers (ID3).


Ge electronics are installed. One Ge detector is under test.


LN2 buggy is connected to Ge detectors.


BD1 is under surgery.


Performance of each Ge detector is monitored through the beamtime.