Updated on Nov 8th by Miura
** Beam Hours (700 Hours Approved in Total)**
Date |
0-8 |
8-16 |
16-24 |
accumulated |
comments |
Nov.8 |
4.0 |
|
|
565.6 |
End of Beamtime |
Nov.7 |
5.4 |
0.0 |
2.5 |
561.6 |
12C run |
Nov.6 |
5.4 |
4.5 |
2.7 |
553.7 |
|
Nov.5 |
5.2 |
6.6 |
4.2 |
541.5 |
|
Nov.4 |
5.0 |
5.2 |
5.5 |
525.1 |
|
Nov.3 |
2.3 |
0.0 |
2.8 |
509.4 |
|
Nov.2 |
5.6 |
4.0 |
2.5 |
504.3 |
500h achieved |
Nov.1 |
5.0 |
1.5 |
0.0 |
492.2 |
Switch to 10B |
Oct.31 |
3.6 |
0.0 |
4.2 |
485.7 |
|
Oct.30 |
6.4 |
4.1 |
3.6 |
477.9 |
|
Oct.29 |
0.0 |
0.0 |
3.6 |
463.8 |
|
Oct.28 |
6.8 |
4.9 |
4.8 |
460.2 |
|
Oct.27 |
6.0 |
3.2 |
1.9 |
443.7 |
|
Oct.26 |
4.5 |
0.1 |
3.0 |
432.6 |
|
Oct.25 |
5.9 |
0.0 |
2.5 |
425.0 |
|
Oct.24 |
2.7 |
2.8 |
4.6 |
416.6 |
|
Oct.23 |
8.0 |
2.4 |
3.0 |
406.5 |
400h achieved |
Oct.22 |
6.8 |
6.6 |
4.0 |
393.1 |
|
Oct.21 |
7.9 |
4.5 |
3.5 |
375.7 |
|
Oct.20 |
7.9 |
2.5 |
8.0 |
359.8 |
|
Oct.19 |
4.4 |
0.5 |
3.3 |
341.4 |
|
Oct.18 |
5.5 |
4.0 |
1.2 |
333.2 |
|
Oct.17 |
2.2 |
0.0 |
0.4 |
322.5 |
|
Oct.16 |
3.1 |
2.0 |
5.0 |
319.9 |
|
Oct.15 |
4.5 |
4.8 |
3.2 |
309.8 |
Achieved 20GK- |
Oct.14 |
3.5 |
4.0 |
5.0 |
297.3 |
Repaired Eurisys Ge (G2) installed |
Oct.13 |
0.0 |
0.0 |
0.0 |
284.8 |
|
Oct.12 |
2.6 |
0.0 |
0.0 |
284.8 |
|
Oct.11 |
2.2 |
4.1 |
7.1 |
282.2 |
|
Oct.10 |
2.3 |
0.0 |
1.0 |
268.8 |
|
Oct.09 |
5.2 |
2.5 |
0.0 |
265.5 |
|
Oct.08 |
2.7 |
3.6 |
2.8 |
257.8 |
Ortec Ge arrived |
Oct.07 |
5.9 |
4.3 |
3.8 |
248.7 |
Achieved 12G K- |
Oct.06 |
3.6 |
1.5 |
2.3 |
234.7 |
|
Oct.05 |
4.2 |
3.5 |
2.6 |
227.3 |
Achieved 10G K- |
Oct.04 |
2.1 |
3.3 |
3.5 |
217.0 |
|
Oct.03 |
2.0 |
0.0 |
5.5 |
208.1 |
Start data condense |
Oct.02 |
2.5 |
2.2 |
2.8 |
200.6 |
|
Oct.01 |
4.6 |
4.0 |
3.6 |
193.1 |
|
Sept.30 |
8.0 |
6.3 |
1.5 |
180.9 |
|
Sept.29 |
3.4 |
3.0 |
7.0 |
165.1 |
17TP/spill on D |
Sept.28 |
6.0 |
8.0 |
0.3 |
151.7 |
|
Sept.27 |
1.5 |
0.0 |
5.0 |
137.4 |
BD1 wire repaired |
Sept.26 |
4.5 |
0.5 |
2.1 |
130.9 |
|
Sept.25 |
7.5 |
1.4 |
4.5 |
123.8 |
12Tp/spill on D |
Sept.24 |
2.5 |
0.0 |
1.7 |
110.4 |
|
Sept.23 |
0.0 |
3.2 |
4.5 |
106.2 |
8Tp/spill on D |
Sept.22 |
1.0 |
0.0 |
0.0 |
98.5 |
|
Sept.21 |
2.0 |
1.0 |
2.5 |
97.5 |
|
Sept.20 |
6.5 |
0.0 |
0.75 |
92.0 |
Beginning of normal runs |
Sept.19 |
2.5 |
0.0 |
1.8 |
84.7 |
24.5->21.5 GeV/c |
Sept.18 |
4.0 |
6.0 |
0.9 |
80.4 |
|
Sept.17 |
4.0 |
0.0 |
0.7 |
69.5 |
|
Sept.16 |
1.0 |
1.5 |
5.5 |
64.8 |
|
Sept.15 |
0.0 |
0.0 |
1.8 |
56.8 |
|
Sept.14 |
2.3 |
0.0 |
0.5 |
55.0 |
48D48 switched to pi- polarity |
Sept.13 |
0.5 |
0.0 |
0.0 |
52.2 |
|
Sept.12 |
0.0 |
0.0 |
0.0 |
51.7 |
|
Sept.11 |
3.5 |
0.0 |
0.0 |
51.7 |
Terrorism |
Sept.10 |
4.7 |
0.0 |
0.0 |
48.2 |
Sept.09 |
4.0 |
5.0 |
5.5 |
43.5 |
Sept.08 |
3.0 |
2.0 |
1.5 |
29.0 |
Sept.07 |
4.5 |
0.0 |
0.0 |
22.5 |
Sept.06 |
7.0 |
3.5 |
7.5 |
18.0 |
Start counting beam hours | >
** Log of the experiment **
Nov.8: Beam time finished at AM4:00.
<\li>
Nov.5: This morning, Takahashi san went back to Kyoto. We achieved 5GK-
for boron target.
<\li>
Nov.4: Thanks to AGS people. We are getting beautiful beam. The beam
is stable and the intensity is good. We found some structure around
600keV for 10B target with 2.5GK- data.
<\li>
Nov.1: No beam during the daytime.
<\li>
Oct.31: We have done some calibration runs. Then switch target to 10_B.
Estimated number of kaon is about 5G K-. We acquired about 42G K- for
16_O target.
<\li>
Oct.29: No beam during the daytime. One of our harddisk(/data2) crashed.
<\li>
Oct.28: We observed some gamma-rays which generated from excitation states
of 16_Lambda_O as the results of offline analysis.
We analyzed about 30G K-. FB2 tripped after power dip. At this time,
we found that potential wire of BD1-plane1 has a large leak current.
But efficiency is not so bad. With online analysis we could see
slightly difference. Ukai-san made the voltage lower. Now, that status
is good. Banu returned to GSI.
Oct.25: Started to make new ntuple files which include two more Ge
detectors(slot7,17) and is corrected three poor calibrated ones.
Oct.20: A slight hint of 16-Lambda-O gamma-rays appeared
from offline analysis of 14.3G K-.
Oct.19: FB4 trouble probably due to unstable power. Need to change the power.
SLOT17 Co pulser HV was found to be too high to give a good coincidence.
Oct.18: Offline analysis effeicinecy was found to be low (1/2)
due to double pulses of TFA-CFD which look like pileup.
Oct.17: SLOT17 CFD time walk was adjusted.
Oct.16: 60Co pulser for SLOT17 was broken. PMT replaced.
In offline analysis we observed 15-Lambda-N gamma-ray peak(s) at 2.27 keV!
Oct.15: Tuned P3 and mass slits to increase K- beam
without reducing K/pi ratio.
In offline analysis, we confirmed that ADC gains are not shifted
at 6 MeV region, and that TDC gates are also OK.
Oct.14: The repaired Eurisys detector (G2) was installed to SLOT17
and UHA gain/TFA gain/inhibit length were adjusted.
Oct.13: Serious trouble in FB1. Changed TDC slot(24->25).
Oct.12: Gamma-ray spectra were made from ntuple files in
"agressive" offline analysis (for 7GK-).
Oct.11: Found that IC2 also has 5.5% of misidentification of K-
as pi-. IC1 has 1.8%.
Oct.10: RHIC maintainance. We mounted G14 to SLOT17, and confirmed that it is
working well.
Oct.9: We checked germanium detector(G14) which arrived from Ortec
yesterday, and we found that it is no problem! We are going to mount
it tomorrow. Trigger improvement is going on. I moved FC about 1cm
to avoid miss correction. We are also considering to place veto
countor just in front of FC. We begin to make ntuple file.
Oct.7: Beam is very good. Proton intensity is about 24TP
(35000DSEC),and this continues relatively constant. We
introduced upper threshold for FC. This reduces low
degrees K- in the trigger effectively ,and makes DAQ easier.
So we opened mass slit. From this, the number of scattered
pi per spill*DTEL increases 1.4 times larger than before.
Now we are ready for accepting much stronger beam.
Oct.5: There seems no problem in our machine status. Beam
intensity is about 180k K-/spill. Now, we are getting 15TP,
and it is hiting on target well. Adam said that HP tried
to increase the limit of chipmunk. So, we hope we could get
more high intensity beam. DAQ efficiency is about 80% now.
At 20:40,we are getting 22.8TP(33000DSEC). It's 240k K-/spill.
Oct.3: This morning, we have no beam because of RHIC study.
At 18:00,we have no beam yet. Air conditionor in our trailer
has broken. But it was already repaired. Beam started at 18:40.
Kishimoto-san tuned D2 and Q1. Then the ratio k-beam to DSEC is 7.
Sept.30: Rain. Many trouble. The biggest one is magnet problem.
At 18:00, fire alarm rang at D-line trailer. Fire department
appeared. It's because of D6-Q5 magnet. There was some trouble
on power supply. At 21:30, magnet was repaired. But K-pi ratio is
still bad. It's about 10:7. This morning, we opened mass slit again,
if we consider about it, this is so bad. Phil and Adam will tune
them. From this morning, the resolution of Ge detector (slot1) became
worse again. Sigma is about 4.2 keV. Efficiency of FD1 u-plane is still
about 75%. Last night, we changed the threshold from 10V to 6.5V.
But it's not so effective. We are going to set it to 10V again.
Sept.29: Tanida-san has gone... Proton intensity of D line achieved
up to 19TP(220k K-/spill). We closed mass slit and changed K-pi ratio
from 1:2 to 1:5. Because DAQ efficiency has decreased into 75.3%.
Now it's 81.5%. Efficiency of FD1 u-plane is still low. So, we increased
gas flow for all chambers.
Sept.28: BD1 had repaired completely. One plane of FD1 (u plane)
is still low efficiency because of low gas gain. But it's getting
better. This morning, we found that FB1 had tripped since wednesday
evening. Total K- loss before now is 600M particle. Intensity of
proton is about 10TP.
Sept.27: We found that one of potential wire of BD1(plane 4) has
broken(13:45). Ukai removed it, and now we are waiting for gas flow.
At 18:30, efficiency of BD1 is about 70%. At 21:40, efficiency of
BD1 is about 80%. AGS continues to tune beam
intensity. Intensity of proton at D target is under 8TP.
But intensity of main ring is about 20TP. There exists too much loss.
After survey by HP,our trailer specified to controled area.
Sept.26: Unstable. Intensity of proton is 8-9TP.
To increase an intensity of AGS, HP has surveied around the area.
If there is no problem, we hope we can get much stronger beam tomorrow.
At the begining of afternoon run, we found that there is no data from
FERA. After power recycle, they recovered.
Sept.25: Proton intensity up to 12Tp. Stable. Spill shape is good (1.4 sec
width). We have 130k K-/spill. NIM bin for MT discri was unstable and
replaced. Some cable for 2nd level signal was found to be unstable
and we lost a few hours Ge data. It should still be monitored.
Sept.24: Several MP counters have low efficicency due to
low gain. HV/threshold were adjusted again.
The UNIDAQ ADC instability could not be solved after all efforts.
We gave it up but not a serious problem.
Sept.23: Kevin Brown in AGS tuned the primary line. 6Tp stable beam
was obtained. Phil brought it up to 8-9Tp. Ge TDC resolution was found
to be not bad (6-9 ns FWHM at >1.5 MeV).
Sept.22: Power dip again. No beam whole day.
Sept.21: Take data with low intensity beam.
Q5 trouble. Power dip.
ID/FD alignment were studied in offline analysis.
Sept.20:
AGS spill length was made longer (2.0 sec flat top, 1.4 sec spill),
although the intensity is still low ( < 5Tp ).
We removed "Takahashi's counter",
adjusted target/IC/FC positions,
cleared "Total Kaon Beam" scaler and started normal runs.
UNIDAQ Ge monitor has started.
Ge TDC's were found to have negligible dead time
except for SLOT1 (3%) which often oscillates.
Various analysis works are in progess.
Sept.19: FD2-V is still noisy but found to be
not serious because cluster size cut
remives the noise and efficiency does not decrease.
Took normal trigger data. Ge electronics NIM power trouble.
SLOT4 HV shutdown.
AGS reduced proton enegy from 24.5 to 21.5 GeV for E930.
Sept.18: Took data without the H2O target and with and without the
48D48 field, and then took normal trigger data without the 2nd level
trigger. Primary beam tuning and K- yield measurement were
done. The beam profile as a function of z was investigated.
All Ge's were found to have good livetime (>90%) with weak beam,
for both ADC and TDC, by UNIDAQ monitoring system.
Sept.17: Took data with various types of triggers.
BD missing wires were fixed. The 2nd level trigger and
event builder were checked. IT ADCs were investigated.
Sept.16: FC threshold was readjusted.
Effects of the 48D48 field to counter gains
and timings were checked. Normal (K,pi) data and control data
(beam through and different triggers) were taken. Also worked on BD missing
channels and Ge monitoring system.
Sept.15: FD3 thres. was raised due to noise from 48D48. FD3 plateau
curve was taken. BGO TDC stop timing and range were changed.
Ge SLOT 1 is sometimes very noisy.
Sept.14: 48D48 polarity was reversed to pi- mode. Rough beam tuning done.
K-/DSEC almost reproduced the value in 1998 run.
BD efficiencies were measured and BD1-plane#2 has low efficiency.
BD HV's were adjusted.
Sept.13: FD3 HV's were readusted. Two bad UHA's were replaced.
Sept.12: No beam at all.
Sept.11: FD3 HV increased to 2100V and thres lowered to 3.1V which gives
96% efficiency. Worked on missing channels in FD's and BD's. Ready for
beam tuning, but beam stopped due to security alert caused by
the terrorism.
Sept.10: ID/FD threshold/HV were finally determined. Efficiencies are more
than 95% for all planes except for FD1V having a missing channel. Noisy
channels in FD2-VV' were fixed. FD3 efficiency was found to be low.
Sept.9: Ge oscillation problem is observed in ORETC detectors in SLOT1,3,10,18.
Except for SLOT1, it happens rarely and is not serious. BD's were checked
and some missing/bad channels were found.
Sept.8: MT-IT satelite peak trouble disapeared. ID/FD efficiencies were
measured as a function of threshold and HV. Low efficiency in FD1-VV' and
FD2-XX' were found and solved later by replacing NIM bin for amp/discri's.
Sept.7: As for ID/FD problem, we fixed a bad grounding of preamp board
but it did not help. Efficiencies of ID/FD's were measured.
Sept.6: ID1,2,3,FD1,2 have a large 2nd component in the TDC spectrum. Ge,
BGO ADC/TDC's were checked. Ge SLOT1 preamp output sometimes has an oscillation.
Missing channel in BGO was fixed. PMT gains of IC1, IC2, FC were raised
and threshoulds were readjusted.
Sept.5: Thresholds of IC1, IC2, FC were adjusted. Trigger timings were
adjusted. The MP problem as completely fixed.
Sept.4: ADC gate/TDC stop timings were adjusted. Gain and threshold of
MP's are adjusted. Some MP's have low pulse height and we changed discriminator
with lower thres. Ge calibration data with 244Cm+13C (for 6 MeV 16O gamma)
were analyzed, and resolution was found to be 5-7 keV (FWHM) at 6 MeV.
SLOT16 resolution was bad (7.4 keV) due to a bad amplifier (UHA).
Sept.3: Proton beam (0.3Tp/spill) hit the D target and we started tuning
the counters. Gain check/adjustment of MT,IT,IC,FC,FV was done, and timing
of MT1-9 was also adjusted. But in 3 hours the beam stopped and did not
come back.
Sept.2: Proton extraction to our D line has started on Sept.2, although
the beam has not hit the D production target yet. We should stay tuned..