Beam defining counter IT installed at the Hyperball frame.
Then IC1 is installed at the Hyperball frame.
Finally, ID3 is installed.
IC2 is installed in the Hyperball frame
(viewed from downstream).
IT, IC2 and weater target (side view).
Water target and FC (side view).