At present, the collaboration plans to fully utilize the allocated beam time by PAC19 
(apparatus development of 7 days and calibration and physics runs of 19 days):
7 days of single spectrometer tuning (HKS and tilted Enge); 
7 days of tuning and calibration runs, 4+8 days of the physics runs for the 
C target 
and  
Si target.