3rd year of Doctor course student
Graduate school of Science,
Tohoku University
東北大学宇宙創成物理学 国際共同大学院履修生 日本学術振興会特別研究員DC1
Here are the internal meeting logs.
| Date | comment | file | file |
|---|---|---|---|
| Sept. 03 | Mainz mtg: Event consistency check, beam stability check | pptx | |
| Aug. 20 | Mainz mtg: Event consistency check | pptx | |
| Aug. 06 | Status & event consistency check | pptx | |
| July 31 | Status | pptx | |
| July 08 | Mainz mtg: Event consistency check | pptx | |
| June 25 | Mainz mtg: Status | pptx | |
| June 12 | Status | pptx | |
| June 11 | Mainz mtg: linearity & z-pos dep. correction, systematic error, beam stability | pptx | |
| May 21 | Mainz mtg: Wobbler parameter, latest value of binding energy | pptx | |
| May 07 | Mainz mtg: Wobbler parameter, peak width evaluation | pptx | |
| May 01 | Status | pptx | |
| Apr. 01 | Situation of calibration | pptx |
| Date | comment | file | file |
|---|---|---|---|
| Mar. 26 | Mainz mtg: Debugging Cola++, calibration with MAMI and undulator results | pptx | |
| Mar. 13 | Debugging Cola++, calibration with MAMI and undulator results, beam energy spread estimation by elastic peak | pptx | |
| Mar. 04 | Mainz mtg.: Summary of the analysis for the peak shape estimation, un-binned peak fit, calibration with undulator results | pptx | |
| Feb. 28 | Peak shape estimation, un-binned peak fit, calibration with undulator results | pptx | |
| Feb. 21 | Peak shape estimation, momentum calibration, others for hyper2022 | pptx | |
| Feb. 13 | Peak shape estimation | pptx | |
| Feb. 07 | Mainz meeting: Summary of PID analysis | pptx | |
| Feb. 07 | PID update, chi2 scan, peak shape estimation | pptx | |
| Jan. 30 | PID update, merge runs w/ and w/o NMR | pptx | |
| Jan. 10 | PID result, unbinned fit | pptx | |
| Dec. 19 | SPADI Monthly mtg: Beamtime summary of AMANEQ installation and feedback | pptx | |
| Dec. 17 | Mainz mtg: PID strategy | pptx | |
| Dec. 13 | Analysis core mtg: PID strategy | pptx | |
| Dec. 12 | Current status and to do | pptx | |
| Nov. 26 | Mainz mtg: G4 simulation, PID strategy, p-value, detector parameter check | pptx | |
| Nov. 18 | Introduction of BPM analysis | pptx | |
| Nov. 12 | G4 simulation, evaluating the actual target thickness | pptx | |
| Nov. 08 | Mainz mtg: G4 simulation angle dependence, pion energy loss with Lithium target | pptx | |
| Nov. 05 | Current status | pptx | |
| Oct. 11 | Mainz mtg: G4 simulation for energy loss effect evaluation | pptx | |
| Oct. 11 | Status and G4 simulation for energy loss effect evaluation | pptx | |
| Sept. 27 | Mainz mtg: status and the new result from STAR | pptx | |
| Sept. 13 | Mainz mtg: Mom calibration with Ta target runs for SpekA | pptx | |
| Sept. 10 | Current status | pptx | |
| Aug. 08 | Mainz mtg: NMR readout | pptx | |
| July 25 | SPADI mtg: Summary of BPM AMANEQ beamtime | pptx | |
| July 18 | Summary of BPM AMANEQ beamtime and data analysis, NMR readout extraction, fitting peak | pptx | |
| June 21 | Mainz mtg: Resolution summary of calib2024, Matrix tuning software | pptx | |
| June 21 | Summary of BPM test beamtime, Resolution summary of calib2024, Matrix tuning software | pptx | |
| June 17 | Summary of test beamtime for AMANEQ installation and tasks | pptx | |
| May 29 | Summary of AMANEQ installation, calibration analysis strategy | pptx | |
| May 23 | SPADI monthly meeting: BPM AMANEQ Installation | pptx | |
| May 23 | Status, BPM trigger plan, summary of calibration beamtime | pptx | |
| Apr. 24 | Status for the BPM, H6 and the calibration beamtime | pptx | |
| Apr. 05 | Status for the calibration beamtime | pptx |
| Date | comment | file | file |
|---|---|---|---|
| Feb. 29 | Status for the calibration beamtime | pptx | |
| Feb. 15 | Particle ID(2) | pptx | |
| Feb. 06 | Particle ID | pptx | |
| Jan. 26 | Status and to-do | pptx | |
| Jan. 19 | Analysis of the calibration run data | pptx | |
| Jan. 12 | Analysis of the calibration run data | pptx | |
| Jan. 01 | AMANEQ installation Log (document) | ||
| Dec. 25 | AMANEQ install @ELPH beamtime | pptx | |
| Dec. 06 | Status and To Do | pptx | |
| Nov. 22 | Parallel computing for BPM analysis | pptx | |
| Nov. 16 | SpecC calibration and data from October's calibration | pptx | |
| Nov. 09 | Status | pptx | |
| Nov. 02 | Status | pptx | |
| Oct. 25 | SpecC calibration | pptx | |
| Oct. 17 | RootTools.cc update, Drift time, drift.sh | pptx | |
| Oct. 11 | RootTools.cc update, Drift time | pptx | |
| Oct. 05 | Coincidence time scan | pptx | |
| Sept. 29 | Status (GPPU school, etc.) | pptx | |
| Sept. 22 | DAQ camp | pptx | |
| Sept. 14 | Beamtime status at Mainz(2) & Analysis plan | pptx | |
| Sept. 7 | Beamtime status at Mainz | pptx | |
| Aug. 23 | pptx | ||
| Aug. 9 | cointime adjusted, pion mom distribution, fitting, Geant4 etc. | pptx | |
| Aug. 8 | cointime adjusted, pion mom distribution, fitting etc. | pptx | |
| July 28 | pion mom distribution & fitting | pptx | |
| July 21 | Mainz analysis (AC) | pptx | |
| July 13 | Beamtime at ELPH, Mainz analysis (AC, tracking) | pptx | |
| June 29 | Beamtime at J-PARC, Mainz analysis, ELPH beamtime preparation | pptx | |
| June 12 | Mainz joint mtg: first H4L peak | pptx | |
| May. 26 | Parameter adjustment, etc. | pptx | |
| May. 18 | Parameter adjustment | pptx | |
| May. 10 | Pedestal extrapolation, Parameter adjustment, time & energy resolution | pptx | |
| Apr. 26 | Debugging tsrc code, ADC parameter adjustment | pptx | |
| Apr. 19 | Ranked by pedestal status | pptx | |
| Apr. 14 | Parameter adjustment w/o tsrc | pptx | |
| Apr. 06 | Mainz core mtg: debug | pptx | |
| Apr. 06 | BPM update (replacing VETO counter) | pptx |
| Date | comment | file | file |
|---|---|---|---|
| Mar. 30 | Mainz joint mtg: analysis status of March | pptx | |
| Mar. 30 | Errors of Cola++, luminosity++, etc. | pptx | |
| Mar. 20 | Luminosity estimation (modified) | pptx | |
| Mar. 10 | BPM rate, Mainz status | pptx | |
| Feb. 17 | report for spekC | ||
| Feb. 03 | pptx | ||
| Jan. 27 | pptx | ||
| Jan. 20 | pptx | ||
| Jan. 13 | pptx | ||
| Jan. 06 | pptx | ||
| Dec. 21 | pptx | ||
| Dec. 09 | pptx | ||
| Dec. 02 | BPM analysis | pptx | |
| Nov. 18 | BPM analysis | pptx | |
| Nov. 17 | Mainz-Tohoku brief meeting | pptx | |
| Nov. 09 | pptx | ||
| Nov. 04 | pptx | ||
| Oct. 21 | pptx | ||
| Oct. 13 | pptx | ||
| Oct. 06 | pptx | ||
| Sept. 29 | pptx | ||
| Sept. 15 | pptx | ||
| Aug. 25 | pptx | ||
| Aug. 09 | rate study of Kaos detectors | pptx | |
| July 28 | Current status of the Mainz experiment and the BPM | pptx | |
| Jun. 15 | Current status of working for the Mainz A1 experiment | pptx | |
| Jun. 07 | pptx | ||
| Jun. 01 | pptx | ||
| May 25 | pptx | ||
| May 16 | pptx | ||
| May 10 | pptx | ||
| Apr. 26 | pptx | ||
| Apr. 20 | pptx | ||
| Apr. 12 | pptx | ||
| Apr. 05 | pptx |
| Date | comment | file | file |
|---|---|---|---|
| Mar. 29 | Analysis of BPM - CM dipole current dependence | pptx | |
| Mar. 08 | pptx | ||
| Mar. 01 | pptx | ||
| Feb. 10 | pptx | ||
| Feb. 01 | pptx | ||
| Jan. 25 | pptx | ||
| Jan. 18 | |||
| Jan. 12 | Mounting fibers of the new BPM | ||
| Jan. 04 | Mounting fibers of the new BPM | ||
| Dec. 21 | |||
| Dec. 17 | |||
| Dec. 03 | |||
| Nov. 26 | |||
| Nov. 18 | |||
| Nov. 16 | Beam Position Monitor, FPGA training course | ||
| Nov. 02 | Beam Position Monitor, Analyzer | ||
| Oct. 26 | Beam Position Monitor, circuit design by cadlus X | ||
| Oct. 19 | Beam Position Monitor | ||
| Oct. 12 | Beam Position Monitor, Frame design, Circuit | ||
| Oct. 05 | Beam Position Monitor, TOT study, Frame design | ||
| Sept. 28 | Beam Position Monitor, TOT study | ||
| Sept. 07 | Beam Position Monitor, Event ID, Rate study | ||
| Aug. 24 | Beam Position Monitor, Systematic error study, etc. | ||
| Aug. 17 | Beam Position Monitor, Rate study, etc. | ||
| Aug. 06 | Beam Position Monitor,Beam position and size | ||
| July 27 | Beam Position Monitor, brief analysis | ||
| July 20 | Beam Position Monitor, brief analysis | ||
| June 22 | Amp. study of the new TOF counter | ||
| May 25 | Amp. study of the new TOF counter | ||
| May 18 | Amp. study of the new TOF counter | ||
| May 11 | |||
| Apr. 27 | |||
| Apr. 20 |
| Date | comment | file |
|---|---|---|
| Apr. 07, 2025 | Introduction for Hypertriton puzzle and current status(2) | |
| Nov. 25, 2024 | Introduction for Hypertriton puzzle and current status | |
| Mar. 05, 2024 | Status of preparation work for the calibration beamtime at Mainz | |
| Jan. 09, 2024 | Parallel computing for BPM & AMANEQ installation | |
| Nov. 07, 2023 | Analysis status of the MAMI experiment (pw required) | |
| May. 30, 2023 | Introduction of the MAMI experiment | |
| Mar. 20, 2023 | Roughly report of BPM & Mainz | |
| Aug. 23, 2022 | Roughly report of the experiment at Mainz | |
| May 09, 2022 | Analysis report of the new Beam Position Monitor | |
| Feb. 28, 2022 | Beam test for the new Beam Position Monitor | |
| Dec. 20, 2021 | Active fiber detector for JLab experiment, Beam Position Monitor | |
| Oct. 18, 2021 | Beam Position Monitor | |
| Aug. 06, 2021 | Brief analysis of Beam Position Monitor | |
| July 06, 2021 | Amp. study, Beam Position Monitor |