Meeting Log | Ryoko Kino

Profile

Ryoko KINO (木野 量子)

  3rd year of Doctor course student
  Graduate school of Science,
  Tohoku University

    email

  東北大学原子核物理研究室
  ストレンジネス核物理

  東北大学宇宙創成物理学
  国際共同大学院履修生
  日本学術振興会特別研究員DC1


Meeting Log

      Here are the internal meeting logs.

ELS meeting and other core-meeting

      (pw: same as ELS wiki)

  FY 2025

            
Date comment file file
May 07 pdf pptx
May 01 pdf pptx
Apr. 01 pdf pptx

FY 2024   (click here)

Date comment file file
Mar. 26 Mainz mtg: Debugging Cola++, calibration with MAMI and undulator resultspdf pptx
Mar. 13 Debugging Cola++, calibration with MAMI and undulator results, beam energy spread estimation by elastic peakpdf pptx
Mar. 04 Mainz mtg.: Summary of the analysis for the peak shape estimation, un-binned peak fit, calibration with undulator resultspdf pptx
Feb. 28 Peak shape estimation, un-binned peak fit, calibration with undulator resultspdf pptx
Feb. 21 Peak shape estimation, momentum calibration, others for hyper2022pdf pptx
Feb. 13 Peak shape estimation pdf pptx
Feb. 07 Mainz meeting: Summary of PID analysis pdf pptx
Feb. 07 PID update, chi2 scan, peak shape estimation pdf pptx
Jan. 30 PID update, merge runs w/ and w/o NMR pdf pptx
Jan. 10 PID result, unbinned fit pdf pptx
Dec. 19 SPADI Monthly mtg: Beamtime summary of AMANEQ installation and feedbackpdf pptx
Dec. 17 Mainz mtg: PID strategy pdf pptx
Dec. 13 Analysis core mtg: PID strategy pdf pptx
Dec. 12 Current status and to do pdf pptx
Nov. 26 Mainz mtg: G4 simulation, PID strategy, p-value, detector parameter check pdf pptx
Nov. 18 Introduction of BPM analysis pdf pptx
Nov. 12 G4 simulation, evaluating the actual target thickness pdf pptx
Nov. 08 Mainz mtg: G4 simulation angle dependence, pion energy loss with Lithium target pdf pptx
Nov. 05 Current status pdf pptx
Oct. 11 Mainz mtg: G4 simulation for energy loss effect evaluation pdf pptx
Oct. 11 Status and G4 simulation for energy loss effect evaluation pdf pptx
Sept. 27 Mainz mtg: status and the new result from STAR pdf pptx
Sept. 13 Mainz mtg: Mom calibration with Ta target runs for SpekA pdf pptx
Sept. 10 Current status pdf pptx
Aug. 08 Mainz mtg: NMR readout pdf pptx
July 25 SPADI mtg: Summary of BPM AMANEQ beamtime pdf pptx
July 18 Summary of BPM AMANEQ beamtime and data analysis, NMR readout extraction, fitting peak pdf pptx
June 21 Mainz mtg: Resolution summary of calib2024, Matrix tuning software pdf pptx
June 21 Summary of BPM test beamtime, Resolution summary of calib2024, Matrix tuning software pdf pptx
June 17 Summary of test beamtime for AMANEQ installation and tasks pdf pptx
May 29 Summary of AMANEQ installation, calibration analysis strategy pdf pptx
May 23 SPADI monthly meeting: BPM AMANEQ Installation pdf pptx
May 23 Status, BPM trigger plan, summary of calibration beamtime pdf pptx
Apr. 24 Status for the BPM, H6 and the calibration beamtime pdf pptx
Apr. 05 Status for the calibration beamtime pdf pptx

FY 2023   (click here)

Date comment file file
Feb. 29 Status for the calibration beamtime pdf pptx
Feb. 15 Particle ID(2) pdf pptx
Feb. 06 Particle ID pdf pptx
Jan. 26 Status and to-do pdf pptx
Jan. 19 Analysis of the calibration run data pdf pptx
Jan. 12 Analysis of the calibration run data pdf pptx
Jan. 01 AMANEQ installation Log (document) pdf
Dec. 25 AMANEQ install @ELPH beamtime pdf pptx
Dec. 06 Status and To Do pdf pptx
Nov. 22 Parallel computing for BPM analysis pdf pptx
Nov. 16 SpecC calibration and data from October's calibrationpdf pptx
Nov. 09 Status pdf pptx
Nov. 02 Status pdf pptx
Oct. 25 SpecC calibration pdf pptx
Oct. 17 RootTools.cc update, Drift time, drift.sh pdf pptx
Oct. 11 RootTools.cc update, Drift time pdf pptx
Oct. 05 Coincidence time scan pdf pptx
Sept. 29 Status (GPPU school, etc.) pdf pptx
Sept. 22 DAQ camp pdf pptx
Sept. 14 Beamtime status at Mainz(2) & Analysis plan pdf pptx
Sept. 7 Beamtime status at Mainz pdf pptx
Aug. 23 pdf pptx
Aug. 9 cointime adjusted, pion mom distribution, fitting, Geant4 etc.pdf pptx
Aug. 8 cointime adjusted, pion mom distribution, fitting etc.pdf pptx
July 28 pion mom distribution & fitting pdf pptx
July 21 Mainz analysis (AC) pdf pptx
July 13 Beamtime at ELPH, Mainz analysis (AC, tracking) pdf pptx
June 29 Beamtime at J-PARC, Mainz analysis, ELPH beamtime preparationpdf pptx
June 12 Mainz joint mtg: first H4L peak pdf pptx
May. 26 Parameter adjustment, etc. pdf pptx
May. 18 Parameter adjustment pdf pptx
May. 10 Pedestal extrapolation, Parameter adjustment, time & energy resolutionpdf pptx
Apr. 26 Debugging tsrc code, ADC parameter adjustment pdf pptx
Apr. 19 Ranked by pedestal status pdf pptx
Apr. 14 Parameter adjustment w/o tsrc pdf pptx
Apr. 06 Mainz core mtg: debug pdf pptx
Apr. 06 BPM update (replacing VETO counter) pdf pptx

FY 2022   (click here)

Date comment file file
Mar. 30 Mainz joint mtg: analysis status of March pdf pptx
Mar. 30 Errors of Cola++, luminosity++, etc. pdf pptx
Mar. 20 Luminosity estimation (modified) pdf pptx
Mar. 10 BPM rate, Mainz status pdf pptx
Feb. 17 report for spekC pdf
Feb. 03 pdf pptx
Jan. 27 pdf pptx
Jan. 20 pdf pptx
Jan. 13 pdf pptx
Jan. 06 pdf pptx
Dec. 21 pdf pptx
Dec. 09 pdf pptx
Dec. 02 BPM analysis pdf pptx
Nov. 18 BPM analysis pdf pptx
Nov. 17 Mainz-Tohoku brief meeting pdfpptx
Nov. 09 pdf pptx
Nov. 04 pdf pptx
Oct. 21 pdf pptx
Oct. 13 pdf pptx
Oct. 06 pdf pptx
Sept. 29 pdf pptx
Sept. 15 pdf pptx
Aug. 25 pdf pptx
Aug. 09 rate study of Kaos detectors pdf pptx
July 28 Current status of the Mainz experiment and the BPM pdf pptx
Jun. 15 Current status of working for the Mainz A1 experimentpdf pptx
Jun. 07 pdf pptx
Jun. 01 pdf pptx
May 25 pdf pptx
May 16 pdf pptx
May 10 pdf pptx
Apr. 26 pdf pptx
Apr. 20 pdf pptx
Apr. 12 pdf pptx
Apr. 05 pdf pptx

FY 2021   (click here)

Date comment file file
Mar. 29 Analysis of BPM - CM dipole current dependence pdf pptx
Mar. 08 pdf pptx
Mar. 01 pdf pptx
Feb. 10 pdf pptx
Feb. 01 pdf pptx
Jan. 25 pdf pptx
Jan. 18 pdf
Jan. 12 Mounting fibers of the new BPM pdf
Jan. 04 Mounting fibers of the new BPM pdf
Dec. 21 pdf
Dec. 17 pdf
Dec. 03 pdf
Nov. 26 pdf
Nov. 18 pdf
Nov. 16 Beam Position Monitor, FPGA training course pdf
Nov. 02 Beam Position Monitor, Analyzer pdf
Oct. 26 Beam Position Monitor, circuit design by cadlus X pdf
Oct. 19 Beam Position Monitor pdf
Oct. 12 Beam Position Monitor, Frame design, Circuit pdf
Oct. 05 Beam Position Monitor, TOT study, Frame design pdf
Sept. 28 Beam Position Monitor, TOT study pdf
Sept. 07 Beam Position Monitor, Event ID, Rate study pdf
Aug. 24 Beam Position Monitor, Systematic error study, etc. pdf
Aug. 17 Beam Position Monitor, Rate study, etc. pdf
Aug. 06 Beam Position Monitor,Beam position and size pdf
July 27 Beam Position Monitor, brief analysis pdf
July 20 Beam Position Monitor, brief analysis pdf
June 22 Amp. study of the new TOF counter pdf
May 25 Amp. study of the new TOF counter pdf
May 18 Amp. study of the new TOF counter pdf
May 11 pdf
Apr. 27 pdf
Apr. 20 pdf

Hlab Meeting

Date comment file
Apr. 07, 2025 Introduction for Hypertriton puzzle and current status(2) pdf
Nov. 25, 2024 Introduction for Hypertriton puzzle and current status pdf
Mar. 05, 2024 Status of preparation work for the calibration beamtime at Mainz pdf
Jan. 09, 2024 Parallel computing for BPM & AMANEQ installation pdf
Nov. 07, 2023 Analysis status of the MAMI experiment (pw required) pdf
May. 30, 2023 Introduction of the MAMI experiment pdf
Mar. 20, 2023 Roughly report of BPM & Mainz pdf
Aug. 23, 2022 Roughly report of the experiment at Mainz pdf
May 09, 2022 Analysis report of the new Beam Position Monitor pdf
Feb. 28, 2022 Beam test for the new Beam Position Monitor pdf
Dec. 20, 2021 Active fiber detector for JLab experiment, Beam Position Monitor pdf
Oct. 18, 2021 Beam Position Monitor pdf
Aug. 06, 2021 Brief analysis of Beam Position Monitor pdf
July 06, 2021 Amp. study, Beam Position Monitor pdf